Since the most advanced Tier 1 equipment and microinverter were used for the installation and operation of the power plant, the owners of this power plant with only 3.28 kWp can increase its capacity at any time by adding new panels.
Solar power plant with a power of 6.56 kWp in the middle of Kanfanar in the interior of Istria.
The solar power plant, with a power of 8.2 kWp, is above average power and can meet all the energy needs of this household.
The solar potential in the area of Samobor is an excellent 1150 kWh/m2, which means that one kilowatt of installed power at this location produces 1150 kilowatt hours of electricity per year.
Installed home solar power plant with microinverters with a capacity of 4.1 kWp
The installed power plant will reduce the ecological footprint on the site by 3300 kg of CO2 per year, which is the same as if the owners planted about 300 trees.